Showing posts with label plaster. Show all posts
Showing posts with label plaster. Show all posts

Thursday, December 29, 2011

Love and Labor


One morning in Kohler, when I had NPR on, an interview captured my attention. In it, a woman with a microphone traveled the country asking people from all walks of life to answer three simple questions for her: "What do you live for?" "What would you die for?" and "What would you kill for?"
Aside the philosophical/existential comments of highly educated and little-lived 30-somethings, most answers had to do with family, one's partner in life, and achieving fulfillment in one's profession or job. But mostly, answers named a person (or persons), loved by and cared about deeply by the interviewee.

The radio piece made me think then, for reasons that only became clear to me much later.
For a while I've been digesting the same topic: Love and Work. Emotional and physical attachment. How they are fundamental to us, human beings; to our being human. How they each can become the driving force and the end result of one another. The expression "Labor of Love" kept floating through my mind.



Love is hard work, a constant maintenance in the same way one might tend a garden, build a house, bake a pie, keep fixing the same rotten junk of a car, or make a piece of artwork.
Labor we think of as the tool, the means to get to something, the token. I wonder if work is only satisfying, only fulfilled when it comes from loving what we do.
Many examples come to my mind for how Labor and Love are intertwined in immensely complex ways. I watched my mother grind her body with repetitive, "dumb" labor for decades; first in a factory, then at home with housework, then in the few different but always physically demanding jobs she held before finally retiring. I can't say she loved these jobs, but somehow the motions of doing them brought a kind of affirmation to her life. Athletes understand intimately how love and labor depend on each other. Distance running is like that for me.


The finished project may feel like a kitchen sink of these ideas for now.
I had made all the pieces at Kohler I felt necessary for an installation that addresses the relationship between Labor and Love. The glazed ceramic pieces are the casts of the broken plaster molds. They look like a field of semi-precious gemstones, partly polished, partly rough. I can also show them on pedestals, isolation and elevation making the individual objects even more precious-looking.
There are accompanying text pieces on tiles, on plaques that attach to the pedestals, and as free floating gold lustered ceramic calligraphy on the wall.
It will be a while for the installation to be shown in its entirety. By then, some things might change, I may have more clarity or at least a better way to talk about it. But I think I've got it right for the most part already.

Here are some images of the finished work (photography by Jeff Machtig of John Michael Kohler Arts Center). Please visit my website timeatihanyi.com for more.



hundreds of pieces of glazed vitreous porcelain cast from the broken mold fragments. the smallest fragment here is about 2" and the largest is about 20"




Monday, December 19, 2011

Repetition

Repetition is in the heart of casting, while repeatability is the cornerstone of any manufacturing process.
Days and weeks blur together during art residencies, losing the track of time completely. Much happens during a workday, sometimes by mid-afternoon it feels like I've lived three full days since the morning.

But much of every day is a returning pattern of getting up, biking to the factory, casting, glazing, cleaning, assembling, moving, finding people to do some kind of specialized task for me, (one of the perks of the factory is the experts crew of workers doing spraying, epoxying, finishing work etc. who would often times help out with things like covering the large surfaces of my pedestals evenly with glaze, fixing pinholes and glaze faults after the firing, or would cut fired ware with a diamond blade to the size and shape I need), having it done, loading or unloading the kilns, more glazing, more loading and unloading and finally biking home to crash for a few hours in the horizontal position until the alarm goes off.
On, and on, and on...
One of the side projects is this large tile with a pattern made with hundreds of barcodes I had fished out of a dumpster (work in progress. the yellow color is that of the plastic film of the barcode decal)

In the final two weeks of the residency this pattern seemed to be on a fast forward. I completely divorced from the circadian pattern and set on a pattern of kilns firing up and cooling down. I would leave the factory at 3am or 5am regularly, returning again at the start of the workday (9am). On one occasion, on the final week, I left at midnight to take a quick nap at the house, then went back to the factory to get something out of the kiln at 3am, which I glazed with gold luster until 9am so that I can pop it back for the next round of firing. Then I stayed on working for an entire day, leaving again at 11pm exhausted to the point of not remembering where I left my bike when coming in.

The nature of my projects dictate a certain kind of repetitiveness too. For the installation, I wanted to create as many pieces as I possibly could, resulting in a series of processes done over and over. However, as much as I had expected the final weeks to be repetitive and predictable to the point of boredom, the numerous side projects I had started but haven't yet finished, and the new ideas for pieces to add to the installation that seemed to uncontrollably flow out of me in the last minute created a welcome break from the predictability (but added to the burden of multitasking).


hospital ware molds on the casting floor adjacent to the A/I studios. look at these perfectly organized rows of molds

the same great form, but each mold has a different personality that is only known to the caster working with these molds

casting cones

The casting floor is a striking visual environment full of repetition. I finally managed to take some images (see above and below)  and got an OK on using them in my artist lectures. Whether it is the gigantic molds laid out in neat rows, or greenware on the conveyer belt, or the casting cones stacked on their racks (plastic cones to be inserted into the pour holes on the molds to store extra slip in order to create a positive pressure in the mold), this visual repetition is seductive to me and my artwork and aesthetic sensibility clearly reflects this fact.
The repetitiveness in the making process or daily routine and the repetition in a visual pattern is attractive for the same reason: There is a promise of organization with a hint of chaos. There is a huge seductive power to the organized pattern that is almost, but not completely, the same throughout. Small distractions, misalignments, and flaws make the uniformity of pattern even more obvious and the tension between the perfect and the almost perfect both jarring and irresistible.
more cones on the rack
more repetition of molds and finished casts  (the ware from the previous day is drying slowly under the shrouds. what was cast today is still in the molds)

Friday, November 25, 2011

Trails and Side-tracks

With the approach of Thanksgiving, the steady pace of production had slowed down a bit in the factory. On Wednesday before the holiday, the sense of excitement in the air was unmistakeable. Most non-essential associates left early for their holiday preparations and it became more difficult to get anything done that was not strictly limited to my studio.
For the first time in two months, I took a day off.

On Thanksgiving day, we went hiking to the northern section of the Kettle Moraine State Forest, around the Greenbush area. The Kettle Moraine has a unique and beautiful rolling topography (moraines) and pitted landscape (kettles).
trail in the Kettle Moraine

Terez, Kristen and me on the hike.

The plants and tree varieties here are distinctly different from those evergreens of the Pacific Northwest; there is a real sense of fall when hiking in Wisconsin. Another thing that signals fall around here is the deer hunting season. Only after we got out of the car in the forest we realized our huge mistake: did not have blaze orange vests to signal our human presence to the hunters that are undoubtedly out there hiding away and waiting for the bush to move. Hunting is as much part of culture in Wisconsin as concealed guns, motorbikes, cheese, the Greenbay Packers, and game day cupcakes frosted with frightening yellow and green.



cupcakes and buns in local colors (this pix is from some time ago, still during Brewers baseball season)

All week, the news is full with efforts to recall the union-busting governor; but Kohler Village is as dormant as the castle of Sleeping Beauty in the fairy tale. When we talk, associates grumble about the work and job security, about cuts to benefits and bargaining rights, about no pay raises for the past many years. There is a general feeling of the workers being taken advantage of due to the recession. Every day, at least half of the associates wear their UAW Local 833 T-shirts emblazoned with Harley-like logo of orange flames to work.

The issue of labor and unions is very complex, historical yet pertinent, and I don't claim to understand it. I listen when they talk to me and I answer the best as I can their questions about our sluggish economy in Washington state. On a funny note: Every time during our conversations, the workers are surprised when I tell them that I teach. In their minds, the artist who come here on a residency come to make money on what they produce. And in their minds, similarly to their industrial production, the more I produce the more money I make. So it makes good economic sense to them that I'm in the studio all the time.

How different reality is!
With a strong will I focus on the blushing plaster fragment project now. I cast all my molds on certain days, the smaller ones twice, which gives me non-stop work of filling molds and then opening, cleaning and reassembling them, taking out casts and fixing the pour-holes on the clay well into the night. The result is about 30-40 casts. Cleaning and glazing that many pieces takes another few days while everything else has to be on hold. This process feels very mechanical, (even to a discipline-queen like I am) and I'm aching to dot this schedule with at least a few side projects that yield to unpredictable results. Doing this casting routine once or twice a week takes so much energy that I always decide to do just a few molds next time, so that I can do other things during the workday. It has gotten so bad this last time with yet another new mold (plus the pedestal and tile molds), that I could not even open some of the molds in time, resulting in casts way too dry by the time I got to them, which cost me more time having to fix cracking around the tougher places.

Studio on week 10: pedestals, small pedestal mold and more molds. There is barely any floor space or work surface left uncovered with stuff drying, waiting to be glazed or finished.

I guess, because of the relative monotony of the casting process and also because my time at Kohler is drawing near, I could never not fully give up the interesting side-tracks. Let's admit it: I'm now finding myself looking for distractions. Whether it is digging up boxes full of discarded barcode decals from the trash, or going through the metal cull for interesting shapes to be used for making plaques for the pedestals, or carving pictures of the local weeds into tiles, or plotting a project that honors the individuality of the workers I made friends with; - I welcome the opportunity that arises to do something else interesting while I'm still here. It's too premature to talk about these projects. They are not finished yet, and due to the lack of time to really develop them, none of these would become a full-fletched project for the time being.

On the other hand, I'm getting beautiful results with the glazes. The colors are heart-stopping in a very bodily, and, as it was commented on, "evocative" way.
Just out of the kiln this week.


There are 4-5 layers of pinks and reds sprayed on very thin to get the blush and I never know what it will look like until it comes out of the kiln. So is the excitement of ceramics.

This past week possibilities for the title of the project occurred to me just out of the blue. I definitely have the words that would be used to describe what the work is about. I'm still trying them out in various combinations.

Wednesday, November 9, 2011

Mood Indigo

In recent days, two books are on my mind: The Wind-up bird chronicle by Haruki Murakami and Mood Indigo (also known as Froth on the Daydream) by Boris Vian.  Both of them were favorites of mine at various ages.
After returning from whirlwind trip to Hungary I had a rougher than expected transition back to the factory-life. It's interesting what a few days of pause can do to the ingrained work process; I had to make tremendous efforts to remind myself of how I've been doing things. The first mold I made after returning was a complete disaster. Looking back at it, it was riddled with bad timing (on my part part) and curious accidents (on the part of the plaster positive, which kept falling apart). The mold works just fine now.
The week I returned, they started covering the large window panels at the factory to protect the ware from the cold drafts that inevitably sneak in during winter. Even though the days were sunny outside, one could not get a sense of it in the inside. Humid heat building up in the casting shop and the light haze through the oppressing plastic dampened my mood for a few days.
With being gone the residency reached its turning point. I have a little over 4 more work weeks left.

The days are short, seems like the nights are even shorter.
I'm barely getting more than 4hours of sleep. I have to constantly remind myself that I need to stop doing side projects, like the constructing pedestals or the little buildings (see pics), playing with the color slips and conducting other experiments with Kohler's unlimited possibilities.


I think I'm having a hard time giving up certain mental versions and iterations of the project I've thought I could accomplish. The only thing need to be focusing on now is to keep casting the broken fragments I already have molds of. Setting the fragments up in an installation was the idea that brought me here and that is the result I ultimately want to be leaving with.
There are 23 shapes already (23 molds made!!!), - a good enough variety. I'm the only one who would notice if I had ten (or even 2 more) shapes, - meaning that I still need to make 10 new molds.
In order to have the necessary volume of objects for an installation, my energies need to go towards casting: every mold, every day. That pretty much necessitates excluding any other project. I'm slowly forcing myself into this mindset but it does not feel right because the raison d'ĂȘtre of being here is that of constant innovation and of playing with the unlimited possibilities.


On the plus side, I had a few of my wonderful friends visiting this past week and I got to give several lectures to college freshmen from Millwaukee. This latter reminded me of interacting with my students, which I duly miss. A photographer came to my studio to take some artist-at-work shots. After a brief but inspiring conversation about my project we decided to frame the shots with the casting shop in the background, which I feel is completely appropriate considering the subject of my work.

Finally, here is the Duke playing Mood Indigo.

sunset over the factory, November 5

Tuesday, October 25, 2011

Notes on Time

Many readers of this blog asked for a detailed account of the factory environment and life. The factory, and within it, the pottery, is a very unique and interesting place, which I will try to describe in this and in forthcoming posts. It's also important to note that Kohler does not allow photography within the factory, so I will not have pictures of the factory on the blog. I don't think that the pics could reflect the true sense of the place, anyway. One has to be here to see, hear and smell it. So, come and visit!
For one thing, it's utterly unreal, a strangely wonderful and wonderfully strange universe of its own. In Kohler village, I cannot avoid to feel a pronounced sense of the put-on: the town feels like a stage-set with its manicured yards and pleasant but drab Mid-West style sleepy homes. Never a soul out and about. No children playing, no noise making. Barely any traffic except for when the shifts are changing in the factory and workers arrive or depart for home.
There are three things I wanted to write about on the account of time: factory time, clay & time, and some personal side notes on time.

Factory time
The factory has a life of its own, independent from what's going on in the rest of the world. It never stops. I can be in the pottery at 9am, 9pm, or 2am in the morning and be sure to have others around, workers attending their tasks. When I bike out I can smell the foundry and listen to the rambling sound it makes. It's going, constantly. There is something comforting in this reliable rhythm of things. It's a like a clock that tells me the time: I look over at a certain hour of the day to the casters of the first shift and I know before turning my head where at they are going to be in their various tasks. They come in in the morning, fill their molds, move down the floor on a series of molds in a choreographed sequence, one by one flipping molds, opening them, joining parts, cleaning joints. Lifting out finished pieces, cleaning and dusting the molds, then assembling them for casting the next morning. Then they move on to the casts of the day before for final checks before they are carted away to the dryers.  They take their few short breaks like clockwork and start banging their tools and buckets together 15 minutes before the shift is over as a signal to start the day's end cleanup and sweeping. This is the first shift from 5:30am to 2pm. These days, in the second shift, only the pressure cast machines are going, with much fewer workers attending to them. Their rhythm is a faster beat: taking the sinks off the machine every few minutes, checking for flaws and wiping them clean. Over and over hundreds of times a day. While a caster who works manually does only 20 to 50 but very complex shapes, the pressure casters are churning out their simple efficiently shaped ware. It's amazing to watch the casters: they move around efficiently without hesitation, like a dancer moving through a well rehearsed movement. Even though they mostly are big guys with big bellies and big arms they move gracefully and with a good sense of rhythm. Most of them have been working for Kohler for 15+ years, sometimes spending as long as 10 years casting the same toilet or hospital ware. 
So, the pottery does not stop. The soundtrack of the morning shift is a contemporary rock-pop station over-flooded with syrupy songs of love and heartbreak (still a welcome change after weeks of heavy metal and '70s hard rock). After the first shift is over and all the manual casters, design, development and administrative people leave there is still much going on: sprayers glazing, loaders and unloaders attend around the kilns, metal cars loaded with unfired ware are being pushed around on a series of ceiling tracks. Night shift workers have their individual soundtracks playing near their stations, accompanied by the bass from compressors, conveyers, forklifts, and moving ware carts.
The evening rhythm is just as reliable metronome as that of daytime. Maybe there is a little more breathing room, space to chat, less confusing movements, if for nothing else but simply for the fact that there are less people around. At 6am and 2pm, like clockwork, swarms of workers are leaving and arriving with their plastic lunch boxes.
Visitors on factory tours like to ask me about my own work schedule: They shake their heads in disbelief when I say that apart from a few hours of eating, sleeping and running or swimming, I'm at the factory 14-16 hours a day. From 8:30am to often 2am or as long as it takes.  We joke around with the associates saying that the resident artists work all 3 shifts. The studio has this effect of sucking you in, and even at 2am it could feel like that I haven't managed to finish everything I planned for the day.
This brings me to the next theme:

Clay & Time
Everyone who has worked with clay understands the importance of time / timing in making.  Clay is this great material that goes from liquid to a hard brittle rock and capable or incapable of doing things in certain stages of its life. For each clay body, this behavior has to be figured out in order to be working with it. The differences can be minute: it could be only 5 minutes drying time between being being able to slice and assemble large forms, (I'm making ceramic pedestals this week for my sculptures.) between the clay being just fine for attaching it or being too dry to do so. So working with clay is like nursing a baby. Especially when it comes to casting. It matters how long the clay slip stays in the mold, how soon I can pour out (creates a certain wall thickness), how long it's left to dry in the mold before taking the form out to patch it up. Each of my molds is a unique shape, size, dampness or dryness, concave or convex, I have to assess them daily and pay attention what they like and don't like in order to successfully cast them. The casters tell me that they have the same experience with the large and seemingly uniform industrial molds. They keep track of each' unique personality and baby it accordingly.
What's true for clay is also true for plaster. I've watched Tom Spleth (see previous post) to build his positive for a new vase form by troveling setting plaster on the floor.  In a plaster class we usually encourage students to make a box into which they pour in the liquid plaster and only remove the box after the plaster is set into a hard block. Working the way Tom does gives one a good understanding of how the material changes over time as the plaster goes through the chemical change of setting and solidifying. Making a mold is a good exercise in timing. Again, even minutes make a world of difference between workable and a torture for my developing carpal tunnel. I can hardly think of another materials that depend so much on time like clay and plaster do. And because of this it's hard to find time for a break when in the studio. There is always something that needs tending; catching in the right stage or coaxing back into it by controlling drying or rehydrating carefully. 

Personal side notes on time:
Some of you might have noticed that I skipped a post last week. I was about to type up the above when I got a phone call from Hungary that my father has passed away unexpectedly. He was in a hospital for a miserable week prior to that, literally between life and death. He was 67. His passing made me consider the passage of time over and over this week. Among other thoughts, it reminded me how much I enjoyed spending time with him when I was little. We would always be doing something creative together: Bauhaus style collages, photography, making up silly songs and word plays. This was before he divorced mom who raised my brother and me by herself. That was also the end of collage making and game playing.
I'm writing this while at Amsterdam's Schiphol Airport waiting to my connecting flight to Budapest to attend his funeral service. I just left the pottery at Kohler at 7am and now I'm sitting here idle several hours and two flights later. Airports and airplanes are heterotopias where time is suspended. Kohler is such a heterotopia. A village stuck in time, a factory that has been operating for over 120 years and never stops (apart from two union strikes that are significant part of US labor history. Read about them on Wikipedia.) Residencies are also heterotopias: while still preserving a sense of normalcy with daily and weekly routines, in every moment, I'm keenly aware that this is not my normal life of social, professional and personal obligations. These periods devoted to the studio solely are a privilege.

a set of ceramic pieces

my studio with 20 molds, a couple of pedestals in the making

new pieces with the pink blushing glaze on a newly finished pedestal